GENERAL DESCRIPTION

Construction of Administrative Building and Gate House for the Nigerian Content Development and Monitoring Board (NCDMB) at the Nigerian Oil and Gas Parks Scheme (NOGAPS), Odukpani in Cross River State.

This includes construction of a Five Floor Administrative Building made of Reinforced Concrete Frames on Pad foundation carrying a 1,000kg Lift; External walls made of sandcrete blocks and internal demountable partitions, Area: 1,184square meters.

Construction of Two Floors Gate House made of reinforced concrete frame on an area of 692 square meteres.

PROJECT DETAILS

Categories:
Client: Nigerian Content Development and Monitoriing Board (NCDMB)
Location: NOGAPS ODUKPANI SITE, CROSS RIVER STATE
Surface Area: 450,000 m2
Completed: Ongoing
Architect: Allied Consultants Ltd

OUR CLIENTS SAYS

We are happy with the services provided by EST Master Construction Limited. Their Contracts team is wonderful. Their Engineers and Architects really know what they are doing. They respond to all enquiries in a very timely manner

We have always trusted EST Master Construction Limited with our construction works, and they have never disappointed us. They are reliable and efficient, plus their attention to details is second to none. I would recommend them to anyone without any hesitation.